cancel
Showing results for 
Search instead for 
Did you mean: 
EN
cancel
Showing results for 
Search instead for 
Did you mean: 
krab-El
Booster

Zone Schedule

krabEl_0-1700702866088.pngI have created a zone schedule but I can edit it. It seems like the elements are locked and on hidden layer. How can I solve this?

1 Solution

Accepted Solutions
Barry Kelly
Moderator

You should have set up a view in the View Map for your schedule.

Make sure it uses a layer combination where the zone layer is visible and unlocked.

Open the schedule with that view and you should be able to edit it.

 

Barry.

One of the forum moderators.
Versions 6.5 to 27
i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11

Go to post

2 Replies 2
Barry Kelly
Moderator

You should have set up a view in the View Map for your schedule.

Make sure it uses a layer combination where the zone layer is visible and unlocked.

Open the schedule with that view and you should be able to edit it.

 

Barry.

One of the forum moderators.
Versions 6.5 to 27
i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11
krab-El
Booster

Great!!! Thanks

Still looking?

Browse more topics

Back to forum

See latest solutions

Accepted solutions

Start a new discussion!