I have a project that I had pretty much finished. I now just got a survey that the clients found. I made a mesh and added all the z elevations points. I was going to make contours lines off of this as the survey just has random survey elevation points. My problem is the mesh I made with the survey points is 900'+ above my model. I can't drag the model up to the mesh because all my window and doors are set to go off of story setting first floor. They don't move when I move the rest of the model up the 900' as they are linked to a story and not wall bases. I can move the mesh down but then all the survey points are off by the 900'+ which will just be confusing later on if cross referencing the survey.
Is there a way to fix this? I thought I could just go into story settings and change the 0.0 to the 900+' , but you can't change the zero mark. I can't find anything on google or searching that tells you how to change project zero to a new elevation. I thought maybe go into project location and change something. I put in the correct lat and long for the project with no effect. I read changing the sea level in project location will not have any affect on project zero location so I didn't try that.
Nick DiPietro
Cad Manager/Monkey
Autodesk Expert Elite
Archicad 26 Solo USA
https://farkasassociates.com/