2004-04-20 07:23 PM
2004-04-20 07:39 PM
Greg wrote:Did you try updating the drawings in PM? I use fills to 'screen' items behind them - such as foundation walls - typically using the 25% dot fill or diagonal line fills with several thicknesses of white pen.
This does not seem to be an option anymore. Everything looks OK in AC, but when I open in PM, all white-penned fills are transparent except 'Solid' fill.
If this is a new "feature," it will torpedo my productivity - is it a bug? Did 2256 reset something in AC or PM that I haven't had to worry about since it's inception in V6.5? Please help.
2004-04-20 08:37 PM
2004-04-21 09:34 PM
Greg wrote:Wow, I like this. Mind if I "borrow" your technique? I hadn't thought of this before, but sounds like a good way to keep elevations connected while also fully correct. And on a semi-related story (hope this is acceptable in... this thread), does AC preserve object order between saves? It didn't seem to be the case, but I could be wrong.
I use fills with a white pen to cover unwanted items - I could, say, cover an unwanted door in an elevation with the 'Stucco' fill with the background pen set to a white pen, 'Bring to Front' the fill and the door would be covered in AC and plotmaker - perfect for showing quick concept alternatives without unlinking the elevation to erase something.
2004-04-21 10:02 PM
Sergio wrote:I use this technique all the time with the Air Space fill to cover and/or fix unwanted lines in plans & elevations - it's a quick and effective patch - you can draw on top, place library parts etc. as well, as long as the Display Order is correct - I never use the Patch Tool anymore.
Wow, I like this. Mind if I "borrow" your technique?...And on a semi-related story (hope this is acceptable in... this thread), does AC preserve object order between saves? It didn't seem to be the case, but I could be wrong.