2020-09-16 12:20 PM
2020-10-20 04:37 PM
2020-10-21 12:41 AM
2020-10-21 01:42 AM
Erwin wrote:For what it is worth, I have found setting up a 3D view with graphic overrides very fast for checking elements classifications are correct (or at least that a classification has been applied) - much faster than schedule.
We use schedules a lot in house for BIM input and proof reading.
Things like: are element classifications correct?
These usually take a minute or two to generate for the entire model and then when you change something, there will be another refresh update.
I've seen other people complain about these regeneration times, so was just wondering if you experienced any improvement there.
2020-10-21 08:43 AM
2020-10-23 04:51 AM
Erwin wrote:This sounds like it might be worth lodging with GS as a wish?
The problem is that by using the syringe tool, it is possible to grab settings of an element and only change things like layer and composite, but not the proper element ID or classification.
2020-10-23 02:18 PM
2020-10-23 02:23 PM
2020-10-26 02:49 AM
Erwin wrote:
The problem is that by using the syringe tool, it is possible to grab settings of an element and only change things like layer and composite, but not the proper element ID or classification.
2020-10-26 08:50 AM