2012-03-1408:20 PM - last edited on 2023-05-2412:58 PM by Rubia Torres
2012-03-1408:20 PM
I was tidying up a project handed to me by drawing a polyline with exact measurements and pressing shift to get 90º corners to create the outer edge of the slab and found that when I overlaid the structural grid over the slab that the grid was not lining up with the slab/walls. Both methods of drawing I thought were accurate so what am I missing?