Intersection priorities on slabs and cement fillings

Zendrix
Advocate

Hi. 

I have a slab that above it has 2 existing steps that im trying to model.

I would think the proper worfflow would be:

 

1. have base slab;

2. create 2 slabs above with just cement filling+ceramic finish and stack them on each other;

3. make sure the cement filling layer of the base slab is touching the cement filling of the secondary slab that sits on the original one, so they connect and i eliminate the ceramic layer in between.

 

But even though the intersection priority of the cement filling is higher than the ceramic tile, when i do the baove operation the ceramic in between does not get out of the way (signed in blue line).

 

What am i doing wrong/ how would you do that operation?

 

Thanks


image.png
AC28 . LeNovo Y520 Intel Core i7-7700HQ @ 2.80GHz 8GB RAM. Windows 10 Home
1 REPLY 1

Hi @Zendrix,

IIUC, you can split this space at the yellow line illustrated below & create two slabs, one at the lower level as it is & one at the higher level with editing the slab composite to expand the cement filling layer to the structural slab top surface.

 