cancel
Showing results for 
Search instead for 
Did you mean: 
EN
cancel
Showing results for 
Search instead for 
Did you mean: 
insideru
Advocate

Schedule - Select of Floor Plan

If I remember correctly, in AC19, selecting a ... door let's say, in a schedule, that has instances in multiple stories, then pushing Select in Floor Plan, used to Select all the doors (in this case) in the floor plan that was open in the main tab.

In AC20 (even on b6005 preview), no matter my current story, if i push Select on Floor Plan it switches my main tab to the lowest story that has an instance of that door.

Is this intended, is there a way to revert back to the old behavior?
ARCHICAD 28 INT
macOS Sequoia
0 Replies 0

Didn't find the answer?

Check other topics in this Forum

Back to Forum

Read the latest accepted solutions!

Accepted Solutions

Start a new conversation!