Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

Customizing finish schedule

Anonymous
Not applicable
I'm trying to create a simple finish schedule in AC10, but I'm having trouble adding custom schedule fields. I added columns for "Custom Text" in my scheme settings, but it's only allowing me three fields of custom text (and I need eight). Is there an easy way to add editable fields that I am missing?
2 REPLIES 2
TomWaltz
Participant
Schedules can only have a column for each parameter that exists in the elements that they are scheduling. You would need to make sure the elements you are listing in your schedule have those 8 text parameters in them before you can make a schedule that lists them.
Tom Waltz
Craig Bagley
Contributor
[I added columns for "Custom Text" in my scheme settings, but it's only allowing me three fields of custom text (and I need eight)]

Were you trying to create an IS, or a list? I'm trying to recreate your situation, but would like more information.
AC27 USA/Build 5030 16" MBP