BIM Coordinator Program (INT) April 22, 2024

Find the next step in your career as a Graphisoft Certified BIM Coordinator!

Documentation
About Archicad's documenting tools, views, model filtering, layouts, publishing, etc.

If can data and Schedules

fuzzytnth3
Booster
I have got IFC properties set up that take data from the doors in a project which then allow me to display that data in a label. That is great and dandy but when I display that data in a schedule I have to use a column in the schedule for each type of door object I have used in the project. In this project we have used three door types, therefore three columns in the schedule.

Is there any way I can either not have to setup a separate IFC property for each door object or a way to get the schedule to display the info in one column instead of three columns ?
AC versions 3.41 to 25 (UKI Full 5005).
Using AC25 5005 UKI FULL
Mac OSX 10.15.7 (19G2021) Mac Pro-2013 32gbRam AMD FirePro D500 3072 MB graphics
2 REPLIES 2
Laszlo Nagy
Community Admin
Community Admin
I think this clip will answer your question. This is a new feature in AC19:

https://www.youtube.com/watch?v=CllJRQ69ADc&index=4
Loving Archicad since 1995 - Find Archicad Tips at x.com/laszlonagy
AMD Ryzen9 5900X CPU, 64 GB RAM 3600 MHz, Nvidia GTX 1060 6GB, 500 GB NVMe SSD
2x28" (2560x1440), Windows 10 PRO ENG, Ac20-Ac27
fuzzytnth3
Booster
Cheers Laszlo, pretty sure that will do the trick. I'm off to try it out
AC versions 3.41 to 25 (UKI Full 5005).
Using AC25 5005 UKI FULL
Mac OSX 10.15.7 (19G2021) Mac Pro-2013 32gbRam AMD FirePro D500 3072 MB graphics
Learn and get certified!