2018-03-07 04:53 PM
2018-03-08 01:20 AM
2018-03-08 09:32 AM
2018-03-08 09:42 AM
2018-03-08 09:51 AM
Johan wrote:Back in the bad old days we only had 14 (or was it 16) intersection priority levels.
I would think Intersection Priority is the one parameter by which elements are cleaned-up.
Johan wrote:This can be done with the same Building Material because you have 2 different composites.
For estimation (using shedules) I want to seperate the concrete blocks used in outer walls from those used in inner walls. But on floor plans they should be drawn as intersecting -> 50% interlocking units.