I am building a counter with complex profile walls.
In the image, you can see the complex profile I created (and applied to walls) at the left side.
At the bottom right, there is the plan view, where you can see the four walls used to create the counter and their reference lines. Notice that one of the curved walls has its direction opposite to the others. Despite this, they connect smoothly in plan view.
At the top right, there is the 3D view, where the problem manifests: those lines between two walls. I tried to change wall direction, but was not able to make it, as the higher part of the counter would not connect.
Anyway the wall direction does not seem to be an issue, because the other connection between the two curved walls with 'conflicting' direction is ok.
I would like to create 3D details and elevations, and these lines would mess these drawings. I Know I can unlink 3D doc or elevation from models and delete the undesired lines, but I'd rather avoid this method, as it is likely that the counter goes under modifications and unlinked drawings would require laborious manual updates.
How can I make a perfect connection in 3D?
---
www.dtabach.com.br ---
AC 24 BR – MacBook Pro 2,9 GHz Intel Core i7 16GB RAM Mac OS 10.14