I have an existing exterior wall and and and existing roof and I want to demolish half of my roof and show a new roof with a different slope. Do I build a new exterior walls at these gap?

existing.JPG

  

new.JPG

 

DNguyen

ArchiCAD 18- 25

(expert in AutoCAD, novice in ArchiCAD)
5 REPLIES 5
Barry Kelly
Moderator

You could add a new wall to fill in the gap, but you may have issues getting it to trim properly.

Or it may work just fine.

 

If not then mark that wall as 'to be demolished' and and then add a new wall.

If that is one tall wall at the end, you may want to split it half way up so you only demolish and replace the top part.

 

Barry.

One of the forum moderators.
Versions 6.5 to 27
i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11
Lingwisyer
Guru

SEO should clean it up fine if it does not trip properly.

 

Ling.

AC22-23 AUS 7000Help Those Help You - Add a Signature
Self-taught, bend it till it breaksCreating a Thread
Win11 | i9 10850K | 64GB | RX6600 Win10 | R5 2600 | 16GB | GTX1660

I model how it's built, that's the advantage of renovation filters.

Model as you build.

If you have to build a new wall then model a new wall.

Erik Bjornhage : SwedishChef, ETTELVA Arkitekter, Gothenburg, Sweden
Architect : Digital Development : Graphisoft Cert. BIM-Manager
ETTELVA Arkitekter : Eriks LinkedIn
DELL Precision 5570; i7-12700H; 64 GB; RTX A2000 [8GB] : AC12 - future
ANDREW-BIMBUILT
Participant

As suggested already, a framer will have to build a new stud wall from the sill plate to the rafter so show the wall area under the shed roof as demo. If a triangular wall was to be inserted into the wall above the existing, this would create a weak hinge. Cool thing with Archicad is that you are digitally building the project.