2013-10-11 10:08 PM
2014-05-27 08:07 AM
2014-06-22 12:44 AM
2014-06-23 08:16 AM
2014-06-23 05:24 PM
2014-06-24 05:18 AM
Eduardo wrote:As far as I know you can't schedule anything in a worksheet.
Yes, this is strictly a 2D technique. May help to select the elevations in a Worksheet and use those fills for the scheduling, you can then update as needed and will not have to deal with mixing 2D and 3D on the same window.
2014-06-26 06:07 PM
PaulS wrote:You can use a Trace Reference of what ever it is you want to know the area of.
I would like to have an auto-summed list of areas taken from an elevation. my guess is that it cannot be done? I work in both v16 and v17. is there a work-around??? thanks.
ArchiCAD 25 7000 USA - Windows 10 Pro 64x - Dell 7720 64 GB 2400MHz ECC - Xeon E3 1535M v6 4.20GHz - (2) 1TB M.2 PCIe Class 50 SSD's - 17.3" UHD IPS (3840x2160) - Nvidia Quadro P5000 16GB GDDR5 - Maxwell Studio/Render 5.2.1.49- Multilight 2 - Adobe Acrobat Pro - ArchiCAD 6 -25
2016-02-09 01:37 PM
2016-02-09 05:27 PM
ArchiCAD 25 7000 USA - Windows 10 Pro 64x - Dell 7720 64 GB 2400MHz ECC - Xeon E3 1535M v6 4.20GHz - (2) 1TB M.2 PCIe Class 50 SSD's - 17.3" UHD IPS (3840x2160) - Nvidia Quadro P5000 16GB GDDR5 - Maxwell Studio/Render 5.2.1.49- Multilight 2 - Adobe Acrobat Pro - ArchiCAD 6 -25
2023-03-16 05:34 AM
This is still true of Archicad 25 - Super disappointing and confusing! I genuinely do not understand why they would exclude elevations from the (very powerful) utility of automatic scheduling. We are trying to use automatic scheduling to extract quantities for quoting and not being able to use this approach for wall tile is frustrating.