Jere
Expert
since ‎2006-04-01
a week ago

User Statistics

  • 295 Posts
  • 2 Solutions
  • 9 Likes given
  • 62 Likes received

User activity

Hi, I think an essential addition to the "Rules & Standards" for the stair tool is a maximum height between landings. In my jurisdiction, there is a maximum height of 3.7 m for stairs until a landing is required (2.4 m in institutional occupancies.) ...
Is there a way to include a true/false variable in a simple IFS function in an expression? I want to use the input in the Description tab of the internal wood door to modify some values in my door schedules. Here is the variable: "Door belongs to the...
Hi, I've been playing around with the curtain wall tool for wall and floor framing. It's probably obvious to some, but some newer users might benefit. Using the boundary method on a floor plan, you can easily create a horizontal curtain wall that can...
Hi, I'm having an issue with a composite floor slab interacting with a footing. The footing consists of a simple slab with a "Structural Concrete" material. The floor slab is a composite with a 4" "non-structural concrete" material and a gravel fill....
Hi, I'm just putting effort into learning to use schedules. For door schedules, I would typically describe doors using both the exterior room and the interior room. As someone with expertise in door hardware, it's important to describe doors this way...