wrong insulation connection
Anonymous
Not applicable
Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
2016-02-05
10:20 AM
- last edited on
2023-05-24
08:43 AM
by
Rubia Torres
2016-02-05
10:20 AM
2 REPLIES 2

Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
2016-02-05 11:50 AM
2016-02-05
11:50 AM
The three walls make a connection, the column just sits 'on top' of it, as it were. The wall connection gets processed first, I think.
You could:
- change the material priority of the masonry or insulation, to stop the insulation going through with the wall connections
- draw the column with a wall, breaking up the connection of the 3 walls, by putting the 4th bit of wall in between
- patch over the unwanted insulation with a 2d fill
You could:
- change the material priority of the masonry or insulation, to stop the insulation going through with the wall connections
- draw the column with a wall, breaking up the connection of the 3 walls, by putting the 4th bit of wall in between
- patch over the unwanted insulation with a 2d fill
Erwin Edel, Project Lead, Leloup Architecten
www.leloup.nl
ArchiCAD 9-26NED FULL
Windows 10 Pro
Adobe Design Premium CS5
www.leloup.nl
ArchiCAD 9-26NED FULL
Windows 10 Pro
Adobe Design Premium CS5
Anonymous
Not applicable
Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
2016-02-05 12:07 PM